Due: Monday, 2 March, 2009
Problem statement:
Prepare a persuasive PowerPoint presentation aimed at convincing the chief estimator of your (imaginary) company that it is counterproductive to use the RS Means catalog as a base for estimating the costs of concrete block (CMU) walls. Suggest a new way of calculating the cost of CMU walls.
The presentation should contain:
- CSI code
- Name and units, costs & crew
- Description of the operations and quantity produced during your observation of the activity
- Duration of each operation
- Number of workers
- Materials needed (and quantity)
- Equipment needed
Submission: Submission will be made to the drop-box of Blackboard.
Grading: The homework worth 100 points. 5 points will be deducted for failing to comply with each of the requirements above. Further deductions (5 points each) will be made for failing to adjust the size of the pictures (KB) to a minimum.